Full house repaint — 4 bedroom
Umhlanga, KwaZulu-Natal
Starts Within 2 weeks
Interior and exterior repaint, minor crack repair and waterproofing on north wall.
R28 000 – R36 000
Leads taken2 / 5
Local work posted by households, body corporates and businesses. Every project is capped at exactly five contractor unlocks.
Umhlanga, KwaZulu-Natal
Starts Within 2 weeks
Interior and exterior repaint, minor crack repair and waterproofing on north wall.
R28 000 – R36 000
Leads taken2 / 5
Pretoria Central, Gauteng
Starts This week
Replace 150L geyser, install drip tray and re-route overflow to outside wall. COC required.
R14 500
Leads taken5 / 5
Durbanville, Western Cape
Starts Next month
Strip old tiles, screed levelling and lay 600x600 porcelain including skirting.
R19 000
Leads taken1 / 5
Bloemfontein, Free State
Starts Within 3 weeks
Supply and fit 5kW hybrid inverter, 2 batteries, DB rework and CoC certificate.
R92 000
Leads taken4 / 5
Nelspruit, Mpumalanga
Starts Within 1 month
48m boundary wall with steel palisade top section and two motorised gates.
R76 000
Leads taken3 / 5
Centurion, Gauteng
Starts Immediate
Fortnightly grounds maintenance, irrigation checks and seasonal planting.
R6 800 / month
Leads taken0 / 5
Gqeberha, Eastern Cape
Starts This week
Trace two active leaks, replace 18m gutters and reseal ridge capping.
R21 400
Leads taken5 / 5
Stellenbosch, Western Cape
Starts Within 2 weeks
Custom counters, shelving and back-of-house prep tables in marine ply.
R58 000
Leads taken2 / 5
Rustenburg, North West
Starts Immediate
Service submersible pump, replace pressure switch and test yield.
R9 200
Leads taken1 / 5
Polokwane, Limpopo
Starts Next month
16 camera install, NVR room fit-out and biometric gate access for 92 units.
R135 000
Leads taken3 / 5